Mining Equipment for Alluvial Gold, Gold Mining Process Line From China Manufacture

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Henan

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-27 13:07

  • Browse the number:

    177

Send an inquiries

Company Profile

Zhengzhou Hengxing Heavy Equipment Co., Ltd.

By certification [File Integrity]

Contact:Ms. Sara Pang(Mr.)  

Email:

Telephone:

Phone:

Area:Henan

Address:Henan

Website: http://zzhxpsj.artstx.com/

Product details
Hengxiang Heavy Equipment beneficiation processing equipment get the user's praise by its advanced technology and excellent quality, Lots of Africa mine oweners order the products from our company.
 

Mining Machine


 Four Steps Of mining process(gold,copper,zinc,lead,hematite)

Step1:Crushing-- Put the mining material broken 
1)Mining process introduction: Due to the volume of ore produced is too large , so it is necessary to the mined ore crushing. In this process , send the ore into the crushing device to crushed . In general, The System requirements of the ore particle size for general 12mm------18mm.
2).Main mining Equipment: Jaw crusher,impact crusher,hammer crusher,cone crusher etc



Step2:Grinding--The processing of raw materials carefully
1) Mining Process introduction: In this process, we must first make clear the requirements for each ore solution particle standards, Based with the aid of various equipment, put all sorts of ore grinding to separation units required unit solution size.
 
2).Main mining Equipment:Feeder,Ball Mill,Classifier, Overflow ball mill,etc.

 
Step3: Sorting --Select fine ore powder
1).Mining Process introduction: In the production process,not all the ore powder are in line with the standard . we need to filter the ore powder . In this process We use professional equipment to elect qualified concentrate powder from ore , eliminated does not meet the criteria for ore.
2).Main mining Equipment:Mixing machine ,Flotate separator,magnetic separatoretc.spiral chute



step4:Dehydration --Take off water in the ore
1).Mining Process introduction: Due to various constraints, after the front of several processes , there are always some residual moisture in the ore powder, then we need to pick out concentrate dehydration, to meet the requirements of transportation and smelting.
 
2.)Main mining Equipment:Vacuum filter,Box pressure filter,Folding belt filter,Ceramic filter,Vacuum pump, Driving thickener,etc.

We can help you to sort out effective solutions to practical problems for the gold mining equipment. If you have problems ,please tell us. That's the best choice!!

Model XJK-0.35 (3A) XJK-0.62 (4A) XJK-1.1 (5A) XJK-2.8 (6A) XJK-5.8 (7A)
Volumem3 0.35 0.62 1.1 2.8 5.8
Capacitym3/min -0.4 0.3-0.9 0.6-1.6 1.5-3.5 3-7
Rotation speedr/min 470 400 330 280 240
Impeller diametermm 300 350 500 600 750
Motor Rotor, Scraping plate, Power, Blade motorkw Y90L-4 Y100L2-4 Y132M2-6 Y160L-6 Y200L2-6
(255M-6)
Y90S-4 Y90S-4 Y90S-4 Y90S-4 Y90L-4
1.5 3 5.5 11 22(30)
1.1 1.1 1.1 1.1 1.5
Weightt/single trough 0.43 0.86 1.38 2.33 3.533