100% Vrigin PTFE Skived Film

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-29 19:04

  • Browse the number:

    252

Send an inquiries

Company Profile

Zhenjiang Chunhuan Sealing Materials Co., Ltd. (Group)

By certification [File Integrity]

Contact:Miss Alice(Mr.)  

Email:

Telephone:

Phone:

Area:Jiangsu

Address:Jiangsu

Website: http://chunhuanfzp.artstx.com/

Product details
Production Descripation 

Item Value Unit Test Method
Thickness 0.02 to 0.50 mm  
Toleracne 0.020 to 0.10 (±0.003)
0.11 to 0.20 (±0.008)
0.20 to 0.50 (±0.02)
mm  
gravity 2.15-2.25 g/cm3 D792
Tensile strength 25 Mpa D-882
Elongation at break 250 % D-882
dielectric constant, 1KHz 2.1 KV/mm D-150
volume resistivity ≥ 1×1017 Ωcm  
arc resistance ≥ 180 sec  
melt point 330 ºC D-3418
temperature resist range -180 to 260 ºC D-3418
 
Photos of products


Our Service
1)Your inquiry will be replied within 2 hours during working time,Within 24hours when rest time.
2)Our working time is 7.30 AM --17:30 PM,Monday to Saturday.
3)General samples time can be arranged within 2--5days.
4)Orders will be produced exactly as request and approved samples.
5)When mass production,we send photos to show the production line.And confirm the estimate time again.
6)At the end of mass production,photos and samples will send to you for approval.You can arrange the inspection.
7)Before shipment,our QC will have inspection to make sure the quality.
8)We always try best to ensure every order to delivery in time.
 
Payment Terms
1)T/T,Cash,L/C.
2)30% deposit,70% balance before shipment.
3)Lead time: 15 days after received deposited for 2tons.
4)Delivery way: By sea,By air, By EMS,DHL,UPS,TNT,FedEx.
 
Packing & Delivery

For sample: By EMS,DHL,UPS,TNT,FedEx
around 5--7 working days to arrive
 
For Bulk order:
1.Qty of 2tons,within 15 days.
2.Via Sea
3.Delivery time:we will finish production in 15days for 2tons.
4.For 20 GP,may nee around 30days.