Waste Tire Recycling Line (Rubber Powder Production Process)

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Shandong

  • Validity to:

    Long-term effective

  • Last update:

    2017-08-10 06:11

  • Browse the number:

    259

Send an inquiries

Company Profile

Qingdao Nayuan Machinery Manufacturing Co., Ltd.

By certification [File Integrity]

Contact:Mr. Jack Chen(Mr.)  

Email:

Telephone:

Phone:

Area:Shandong

Address:Shandong

Website: http://qdnayuan.artstx.com/

Product details

Automatic rubber power production process consists of:

Hook Debeader→Whole Tire Cutter→Whole Tire Shredder→Rubber Crushing Mill→
Auxiliary Machine(vibrating screen, belt conveyor, magnetic separator etc.)→
Fiber Separator→Fine Rubber Power Pulverizer


1.Pull out the wires from the tire bead.
2.Cut the whole waste tires into small parts.
3.Shredding the waste tires or rubber blocks into 50*50mm.



4.The roller has groove, used for crushing the raw rubber.
Rolls have chilled alloy cast iron and cast steel two kinds optional.



5.Components:vibrating screen, belt conveyor, magnetic separator etc.
6.Separate the fine fabric from the rubber powder.
7.Pulverized into rubber powder that satisfy demand.



Here are the facts.
In 1990, it was estimated that over 1 billion scrap tires were in stockpiles in the United States. As of 2015, only 67 million tires remain in stockpiles.In Los Angeles County, approximately ten million waste tires are generated annually.
Waste tires pose a serious threat to public health and safety.Because they are highly durable and non-biodegradable, they can consume valued space in landfills.
Waste tire recycling technology has made tires turn into new rubber products, playground surfacing, new tires, and rubber modified asphalt.
We have the same ideal with you on environmental protection. If we establish relations of cooperation, the price will be suitable and you have our promise on High-quality.


 
FAQ
1. Quality :
Quality guarantee: One year.
Deliver a high-quality machine as promised. Each one has passed strict testing to ensure our machine in perfect working condition.
2. Transport package:
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
3. Delivery date:
There are available machine in our factory and customized machine according to your request. Available machine can be delivering ASAP. Customized machine from designing to completion will cost 25-35 days normally.
Long-term cooperative relation with COSCO, ensures the goods delivery on time.
4. Installation and commissioning overseas:
Overseas service and technical support can be supplied but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days, large machine usually takes about 30 days.
5. Visit:
Our company is located in Qingdao City, Shandong province, China.
The name of airport is QingdaoLiuting airport.
Please contact us in advance and we will pick you up at the airport.

 
Any question or for further information, please contact us
Meanwhile, welcome to visit our factory!